转贴Alexander Romashchenko制作“Le Requin”的过程(9)
接上回~~Mon Mar 23, 2009 5:44 pm • Post subject:
Installation stern bas-reliefs.
安装船尾浅浮雕
Tue Mar 24, 2009 8:54 pm • Post subject:
Installation of carvings. Continious.
雕刻件的安装,继续
Wed Mar 25, 2009 7:07 pm • Post subject:
Installation of the carvings. Finishing.
雕刻件的安装,完成
Sat Mar 28, 2009 6:10 pm • Post subject:
Cannons. Installation.
炮,安装
Sat Mar 28, 2009 7:33 pm • Post subject:
That looks beautiful, but I'm a bit puzzled. The gun is run out, yet the train tackle is already at its shortest position.
这看起来漂亮,但我有点纳闷。炮是放完的,然而一系列滑轮已经在最短的位置了。
Druxey
Sat Mar 28, 2009 8:44 pm • Post subject:
You are right, Druxey. Really on the drawings (and I made Xebek strictly according the drawings including cannons and pulleys) and book included hinder pulleys not mantioned at all. May be for 8 pounds cannon above pulleys is not necessary. I am showing those pulley for better fixing cannons on the deck to aviod gluing the cannons.
你说得对,Druxey。的确在图纸(我是严格按照图纸制作的,包括大炮和滑轮)和书上包括阻止滑轮根本没有提到。可能对于8磅炮上述滑轮是不必要的。我显示这些滑轮为了更好的在甲板上固定大炮,避免用胶粘合的大炮。
_________________
Regards Alexander
Sun Mar 29, 2009 1:46 pm • Post subject:
Cannons. Installation. Some detailes.
炮,安装,一些细节
Tue Mar 31, 2009 8:52 pm • Post subject:
Cannons. Installation. Main work done.
炮,安装,主要工作完成
Thu Apr 02, 2009 7:38 pm • Post subject:
Cannons. Installation. Continious.
炮,安装,继续 很好的学习资料。 好东东啊
学习学习 太美了,谢楼主多发好东西 做的太漂亮了 职业玩家的水品就是不一般,还要继续努力学习啊